Production stages/time frames...
Production stages/time frames...
My Nov build S cab is designated as order confirmed, and the dealer assumes it will be designated plant production this weekend. Is production usually a 3 week time frame? I understand it will be 2 weeks into production before a VIN is assigned. Any thoughts as to on vessel by months end?
My 2 cars that I ordered from Porsche over the last 5 yrs ...once they went into production. I was amazed at how fast it goes at the actual plant to build them. Then about 3 weeks on the boat. 4 to 6 week venture total time and you have the car. In, '99 My Boxster had a 10 month wait b4 it went into production, that was a sooo PAINFUL...goodluck on yours
Thanks V, I've never ordered a P car before. Wasn't too worried about the time frame in Aug...but now I'm getting itchy. Always have been an instant gratification type. At least I'm still driving thr 996.
Thread
Thread Starter
Forum
Replies
Last Post
Chris Green@USP
997 Turbo Vendor Classifieds
1
Jan 28, 2016 02:22 PM
ModBargains
Audi Vendor Classifieds
1
Sep 1, 2015 05:26 PM
ModBargains
Tesla Motors Vendor Classifieds
0
Aug 20, 2015 12:28 PM
Chris Green@USP
996 Turbo Vendor Classifieds
0
Aug 20, 2015 11:30 AM





