[Need help] Mobridge installation in CDC area
[Need help] Mobridge installation in CDC area
I am planning to install mobridge ABT unit this week.
I will install the unit in CD Change area.
As my understanding, I need to pull optical wire connector from CDC,
Disassemble the connector, replace one optical wire from connector with an optical wire from mobridge,
put the connector back to CDC,
connect the optical wire from replace with another optical wire from mobridge.
Is it right?
My question is where I can put the optical Loop?
when there is no spot left for optical loop?
I will install the unit in CD Change area.
As my understanding, I need to pull optical wire connector from CDC,
Disassemble the connector, replace one optical wire from connector with an optical wire from mobridge,
put the connector back to CDC,
connect the optical wire from replace with another optical wire from mobridge.
Is it right?
My question is where I can put the optical Loop?
when there is no spot left for optical loop?
Thread
Thread Starter
Forum
Replies
Last Post



