some updates. Long time but much has been accomplished:
all electrical, plumbing (air and water lines) so the insulation and drywall was done


taping and floating the drywall. I'm leaving the surfaces without texture so a longer process for floating is being done. Also, I put up 3 50' air hose reels in the ceiling for easy access


installed #13 8' strips of T8 high output 4 bulb fixtures. This keeps it plenty bright in the garage at any hour. I had the lights wired so I can turn on and off the lights in banks of 3 to allow the option of running only what I need


the exterior 3-part stucco was completed and the metal roof tiles (hail and hurricane proof) are almost done. The metal shingles weigh <20% of what a traditional clay tile weighs, which allows for less stress on the roof

all electrical, plumbing (air and water lines) so the insulation and drywall was done

taping and floating the drywall. I'm leaving the surfaces without texture so a longer process for floating is being done. Also, I put up 3 50' air hose reels in the ceiling for easy access

installed #13 8' strips of T8 high output 4 bulb fixtures. This keeps it plenty bright in the garage at any hour. I had the lights wired so I can turn on and off the lights in banks of 3 to allow the option of running only what I need

the exterior 3-part stucco was completed and the metal roof tiles (hail and hurricane proof) are almost done. The metal shingles weigh <20% of what a traditional clay tile weighs, which allows for less stress on the roof
Last edited by eclou; Oct 18, 2013 at 08:32 AM.