6SpeedOnline - Porsche Forum and Luxury Car Resource

6SpeedOnline - Porsche Forum and Luxury Car Resource (https://www.6speedonline.com/forums/)
-   Lamborghini (https://www.6speedonline.com/forums/lamborghini-41/)
-   -   Cincy2's Underground Racing TT LP 560 project... (https://www.6speedonline.com/forums/lamborghini/337157-cincy2s-underground-racing-tt-lp-560-project.html)

Underground Racing May 15, 2014 11:22 AM

Cincy2's Underground Racing TT LP 560 project...
 
3 Attachment(s)
Thanks to Eric for choosing Underground Racing for his TT Gallardo project. Once we complete this project it will be headed to South Florida. This will be a Stage 3 setup with the full engine build. It will put out 1,000+ whp on pump gas, and a very conservative 1,250 whp on 109 octane. Eric set up his appointment for the turbo build about a month ago. Once here and through the check in process, the car began to be disassembled. This is scheduled to be a 6-8 week build. I will post some pictures along the way.


Engine was out within 24 hours and is headed to the machine shop now. ;)



https://www.6speedonline.com/forums/...ine=1400174522



https://www.6speedonline.com/forums/...ine=1400174522



https://www.6speedonline.com/forums/...ine=1400174522

ecpChris May 15, 2014 11:35 AM

Awesome, I never get tired of reading about these builds.

Underground Racing May 15, 2014 11:55 AM

2 Attachment(s)
https://www.6speedonline.com/forums/...ine=1400176541



https://www.6speedonline.com/forums/...ine=1400176541

XLR82XS May 15, 2014 12:02 PM

6-8 weeks?? You guys are super fast! Should be ready next weekend. ;-)

Cincy2 May 16, 2014 05:01 AM


Originally Posted by XLR82XS (Post 4114878)
6-8 weeks?? You guys are super fast! Should be ready next weekend. ;-)

Wish that were true...

Cincy hilarious

stkjock May 16, 2014 08:12 PM

Congrats Cincy

UGR- how many TT Gallardos does the shop turn out in a typical month?

Underground Racing Jun 18, 2014 05:48 AM

3 Attachment(s)
We are 4 weeks in on this project.. wont be long until its back on the road. ;)





https://www.6speedonline.com/forums/...ine=1403092110



https://www.6speedonline.com/forums/...ine=1403092110



https://www.6speedonline.com/forums/...ine=1403092110

Duhawks Jun 18, 2014 05:56 AM

Looking good!

Underground Racing Jun 21, 2014 06:14 AM

1 Attachment(s)
Turbo system up next. ;)

https://www.6speedonline.com/forums/...ine=1403352849

Underground Racing Jun 24, 2014 05:33 AM

1 Attachment(s)
https://www.6speedonline.com/forums/...ine=1403609597

ZO6ER Jun 24, 2014 07:06 AM

quick

sunburned Jun 24, 2014 07:44 AM

I'd assume the turbo system is just bolt on at this point? Pick stage, build engine/trans/diff, insert piping with specific size turbo and download tune?

Still an awesome turn around time, but I'm sure doing dozens or hundreds of these things has really sped up your process.

Underground Racing Jun 24, 2014 07:56 AM


Originally Posted by sunburned (Post 4141377)
I'd assume the turbo system is just bolt on at this point? Pick stage, build engine/trans/diff, insert piping with specific size turbo and download tune?

Still an awesome turn around time, but I'm sure doing dozens or hundreds of these things has really sped up your process.


Yes but we still fabricate the Turbo systems in house a long with everything else other than custom CNC parts, billet gear sets and etc. We use Proline Racing for engine builds as we have since the first day we started this business over 10 years ago. Transmission shop is in house as well. John Reed builds our harnesses for the Motec setups which are all 99% plug and play. (no hacking into wires) I believe we are the only tuner that has a PNP harness for the LP's. We dyno every car, tune or tweak each and everyone to make sure every car is spot on. ;)

Underground Racing Jun 24, 2014 08:07 AM

1 Attachment(s)
This is the JRR Motec setup with Underground Racing custom spec Plug and play harness.

https://www.6speedonline.com/forums/...ine=1403618833

sunburned Jun 25, 2014 01:30 PM


Originally Posted by Underground Racing (Post 4141386)
Yes but we still fabricate the Turbo systems in house a long with everything else other than custom CNC parts, billet gear sets and etc. We use Proline Racing for engine builds as we have since the first day we started this business over 10 years ago. Transmission shop is in house as well. John Reed builds our harnesses for the Motec setups which are all 99% plug and play. (no hacking into wires) I believe we are the only tuner that has a PNP harness for the LP's. We dyno every car, tune or tweak each and everyone to make sure every car is spot on. ;)

Oh yeah, I wasn't questioning whether or not you guys fab all the kits in house. Just figured you pre-fabbed all the kits and had them stocked on shelves ready to go on when the engine/trans/diffs were completed. Sure cuts down on turnaround time when you aren't fabbing up every kit as they come in.

That work on the wiring harness is amazing. Got any fancy pics of the trans/diff internals or is that all proprietary stuff that you can't show? Everyone likes pictures of shiny CNC'd metal :D


All times are GMT -6. The time now is 10:11 PM.


© 2026 MH Sub I, LLC dba Internet Brands