January 19th, 2012 - Few pics of the update...
Interior.. took the dash out and put just the rebar to hold the steering column in place..
Also installed my Ti Catback
And my MB FD was featured in S3 Mag and they are using one of the photo of my car on their website..
www.s3mag.com
I have a ton of photos of the new set up tomorrow...
Interior.. took the dash out and put just the rebar to hold the steering column in place..
Also installed my Ti Catback
And my MB FD was featured in S3 Mag and they are using one of the photo of my car on their website..
www.s3mag.com
I have a ton of photos of the new set up tomorrow...
#47
January 20th, 2012 - Update from my fabricator's work. Walker Morgan from www.MPFab.com did an awesome job on these parts.
Downpipe
Inside the DP.. you could almost see through..
Downpipe
Inside the DP.. you could almost see through..
#48
January 22nd, 2012 - I've ordered a new wastegate from a friend from the past who owns www.znperformance.com
Gave me a great deal the Tial 44mm MVR wastegate!
www.znperformance.com
While I was at it, I also ordered one of these from ZNPerformance..
Gave me a great deal the Tial 44mm MVR wastegate!
www.znperformance.com
While I was at it, I also ordered one of these from ZNPerformance..
#51
January 27th, 2012 - Not much update... I got my new tires the other day and just dropped them off this morning to get it mounted. There is only one place in Bham, AL that I would let people touch new wheels... and only because they have the right machine to do so... Corgi Artiglio Master and Hunter load balancer. This shop also uses special weight for your wheels.. expensive, but worth it!
Wheel Spec: The New WORK CR Ultimate 18x9.5 Front and 18x10.5 Rear
Tire Spec: Toyo Tires, R888 - Front 255/35, Rear 295/30
Wheel Spec: The New WORK CR Ultimate 18x9.5 Front and 18x10.5 Rear
Tire Spec: Toyo Tires, R888 - Front 255/35, Rear 295/30
#53
Thank you
more update..
February 3rd, 2012 - Few things happened since last update...
Toyo R888s are mounted on the new wheels and now back at the house.
20b stainless flange is machined flat and ready.
All the exterior plastics have been pulled and fenders are on for test fitting.
and testing out the bumper..
more update..
February 3rd, 2012 - Few things happened since last update...
Toyo R888s are mounted on the new wheels and now back at the house.
20b stainless flange is machined flat and ready.
All the exterior plastics have been pulled and fenders are on for test fitting.
and testing out the bumper..
#55
February 12th, 2012 - Not much update as I been spending my spare time trying to get my old house in order and put it back on the market. Some idiot kicked down my door to the garage and I had to get that fixed and been painting the interior to update the house a bit... This housing market is killing me and I need to sell this so I can dump it in to this project.
Anyhow, Only car thing I did since last update...
Put these Mazda posters I had (for about 7 years) in my garage..
And got my spoilerless hatch painted MB and mounted (pics later).
Anyhow, Only car thing I did since last update...
Put these Mazda posters I had (for about 7 years) in my garage..
And got my spoilerless hatch painted MB and mounted (pics later).
#56
February 16, 2012 - Not much update as I'm currently waiting on parts to finish the V mount set up and such..
Mean while, I'm working on my MB RX-7... Took the CF hatch and the wing and now... going wingless...
sorry for the bad pic.
Mean while, I'm working on my MB RX-7... Took the CF hatch and the wing and now... going wingless...
sorry for the bad pic.
#58
Thank you!
less update...
February 21st, 2012 - Not much of an update as I'm waiting for few things to come in to finish up the project..
One thing that did come in is the intercooler core from http://www.bellintercoolers.com/
Waiting on couple of things that are suppose to show up in next 2-3 weeks... Then the car will go through quick changes from that point on..
less update...
February 21st, 2012 - Not much of an update as I'm waiting for few things to come in to finish up the project..
One thing that did come in is the intercooler core from http://www.bellintercoolers.com/
Waiting on couple of things that are suppose to show up in next 2-3 weeks... Then the car will go through quick changes from that point on..