HIRISC, this is amazing. I dont know if you have ever heard of Clive Cussler (he is a fantastic author), but his main character in his novels, Dirk Pitt, lives in basically what you are are building. The only difference his that his is in an old aircraft hanger at the D.C. airport.
Anyways, ever since I read my first Dirk Pitt novel by Clive Cussler, Ive wanted to have the same type of place. It is second to none man. May you finish it and enjoy it in good health! Im sure you will!
Keep the updates coming,
Chris
Anyways, ever since I read my first Dirk Pitt novel by Clive Cussler, Ive wanted to have the same type of place. It is second to none man. May you finish it and enjoy it in good health! Im sure you will!
Keep the updates coming,
Chris
Thanks
I'll let you know very soon
Some of the guys were off last week off, but we still got a lot done.
Progress report:
Electrical done
Lighting done - think I have enough light under the mezzanine? :P
Doors installed - including deck door (still need trim)
2-3 coats of paint - burnished clay for the lower level, fashion grey upstairs
Painted sprinkler lines white/grey to match ceiling or adjacent walls.
Off for the rest of the weekend, so...
Next week:
Plumbing - install wash sink, plumb hot water heater/softener
Install air compressor
Stair treads/kick plates
7/16" cork flooring upstairs
Window trim painted/trimmed
Take the eucaboard off the concrete floor
Cabinets - both upstairs (maple) and downstairs (black/aluminum) come +/- 15th of Jan.
Lifts/TV's/furniture after that
Before sprinkler painted:

After:

Other:






Progress report:
Electrical done
Lighting done - think I have enough light under the mezzanine? :P
Doors installed - including deck door (still need trim)
2-3 coats of paint - burnished clay for the lower level, fashion grey upstairs
Painted sprinkler lines white/grey to match ceiling or adjacent walls.
Off for the rest of the weekend, so...
Next week:
Plumbing - install wash sink, plumb hot water heater/softener
Install air compressor
Stair treads/kick plates
7/16" cork flooring upstairs
Window trim painted/trimmed
Take the eucaboard off the concrete floor
Cabinets - both upstairs (maple) and downstairs (black/aluminum) come +/- 15th of Jan.
Lifts/TV's/furniture after that

Before sprinkler painted:
After:
Other:
Last edited by HIRISC; Dec 31, 2009 at 04:52 PM.
I'll get blender ready for April
Be sure to post pics of the cabinets, they really do make the space. The sprinkler system does blend in very well when painted.
Mike
Last edited by FLT6SPD; Jan 1, 2010 at 02:05 PM.


Last edited by HIRISC; Jan 1, 2010 at 02:32 PM.
Thanks
Thanks AJ. April C&C is right around the corner
You get engaged yet?
Thanks AJ. April C&C is right around the corner

You get engaged yet?
AJ bought a NOS system for the vette instead of a ring. Probably been sleeping on the couch.
Cars & Cafe and Motorplex have a great synergy.
The head of Motorplex is a car guy through and through and that vibe and growing facility draw in a much larger crowd of attendees than I think would show up anywhere else. The give back is that C&C is a great marketing vehicle for pulling in potential clients for Motorplex.
Kudos to Luis/Tyler & Bruno for working it all out.